Repairs to highway bridge pier No. 2. Bridge in foreground, and pier to the left. Upstream is cat-walk, and trestle for conveyor running from east side to main 60-inch conveyor transporting overburden to Rattlesnake Canyon
Description
Aerial view of highway pier repair activities and the long view of the aggregate conveyor heading towards Rattlesnake Canyon during low river elevation.
Photographer Unknown; United States Department of the Interior: Bureau of Reclamation; United States Department of the Interior: Bureau of Reclamation
Library of Congress Subject Headings
Bridges--Foundations and piers--Design and construction; Highway Bridge--Columbia River; Tie Rods--Timber Cribs--Cofferdam--Washington (State)--Grand Coulee Dam; Cofferdams--Washington (State)--Grand Coulee Dam
To order a reproduction please see: http://www.libraries.wsu.edu/masc/ , or contact Washington State University Libraries, Manuscripts, Archives, and Special Collections: (509) 335-6691.