Skip to main content

CONTENTdm Website

Add or remove other collections to your search:



Narrow your search by:



Author

Date Original

Digitization

TGM Subject

You've searched: Frank A. Banks Collection

  • TGM Subject: Employees
(169 results)



Display: 20

    • L-1 Transformer

    • Employees--Washington (State)--Grand Coulee Dam; Electrical apparatus; Hydroelectric power; Power plants--dams--Washington (State)--Grand Coulee Dam
    • Employees installing a transformer on the transformer deck of the left powerhouse.
    • Glass Block Window Frames

    • Construction employees; Window boxes--Washington (State)--Grand Coulee Dam
    • Three employees of contractor Owens-Illinois Glass Company are shown constructing one of the ten bay windows for the downstream wall of the left powerhouse.
    • First-aid Training

    • Employees--Washington (State)--Grand Coulee Dam; First aid--Washington (State)--Coulee Dam
    • Fir-aid instructors' class. Instructor demonstrating with rubber tubing the arterial pressure points for shutting off the blood stream at various parts of the body.
    • Elevator in West Powerhouse in Operation

    • Elevators; Employees--Washington (State)--Grand Coulee Dam
    • A passenger leaving the 4,000-pound capacity elevator in the control bay of the west powerhouse. The machine can be operated either with or without an attendant, and travels about 180 feet. A 10,000-pound capacity freight elevator is in service in...
    • Reinforcing Steel

    • Safety equipment; Employees--Washington (State)--Grand Coulee Dam; Smoking--Washington (State)--Grand Coulee Dam
    • A photograph of workers preparing heavy reinforcing steel while two men loiter smoking.
    • East Powerhouse

    • Concrete; Construction; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • A view of the construction status of the east powerhouse at the Grand Coulee Dam up to the date of the picture.
    • Concrete Skipway

    • Equipment & personnel transportation; Concrete; Construction; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • View down the concrete transfer skipway toward the east powerhouse area.
    • Niles Radial Drill Press in Work

    • Drilling & boring machinery; Employees--Washington (State)--Grand Coulee Dam
    • A six-foot Niles radial drill press, in the machine shop of the left powerhouse, was used to bore a re-babbited wear-ring in the stuffing-box of turbine L-3.
    • L-1 Stator

    • Hydroelectric generators; Power plants--dams--Washington (State)--Grand Coulee Dam; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • Stator of Westinghouse 108,000-kw. generator L-1 being set in place over finished steel blocks and anchor bolts embedded in concrete, concentric with the axis of the turbine.
    • Crane Preparing to Lift Intermediate Shaft of L-1 Generator

    • Hydroelectric generators; Power plants--dams--Washington (State)--Grand Coulee Dam; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • Crane hooking on to the 24-foot intermediate shaft of generating unit L-1. Hinged fixtures facilitate bringing the shaft into a vertical position, with the fixture at the left uppermost.
    • Bill Miller Prepares for Coupling of Turbine Shaft

    • Hydroelectric generators; Employees--Washington (State)--Grand Coulee Dam
    • The 24-foot intermediate section of the shaft of unit L-1 being lowered into position for coupling with the turbine shaft. Bill Miller, master mechanic, inspects the surface of the shaft flange; Don Reeder, machinist foreman, at the right; "Doc"...
    • Rotor of Westinghouse Generator

    • Hydroelectric generators; Power plants--dams--Washington (State)--Grand Coulee Dam; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • Lowering the 537-ton rotor of Westinghouse 108,000-kw. generator L-1 into place.
    • Workmen Tighten Nuts

    • Employees--Washington (State)--Grand Coulee Dam; Electrical apparatus; Hydroelectric generators
    • Workmen tightening nuts on the thrust bearing runner of unit L-1. An insulator bushing of a General Electric 36,000-kv.-a. transformer at the left.
    • Shaving to Size

    • Employees--Washington (State)--Grand Coulee Dam; Hydroelectric generators; Grinding machines
    • For the purpose of improving the operation of turbine L-1, the trailing edges of the runner blades were reduced in thickness by chipping and grinding.
    • Powerhouse Floor

    • Hydroelectric generators; Power plants--dams--Washington (State)--Grand Coulee Dam; Employees--Washington (State)--Grand Coulee Dam
    • Setting on the powerhouse floor at El. 991, between generators L-2 and L-3, steel plates on which to assemble the stator of Shasta generator.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK