Skip to main content

CONTENTdm Website

Add or remove other collections to your search:



Narrow your search by:



Author

Date Original

Digitization

TGM Subject

You've searched: Frank A. Banks Collection

  • TGM Subject: Coulee
(269 results)



Display: 20

    • Misty Switchyard

    • Electrical apparatus; Fog--Washington (State)--Grand Coulee Dam
    • Take-off towers in bay LY-1 of the 17 bay, 230-kilovolt left switchyard formed one end of the fist transmission lines to join Grand Coulee and Bonneville dams. The circuit was temporarily strung to this bay because of a shortage of steel for towers...
    • Whitestone Rock

    • Boats--Washington (State)--Grand Coulee Dam; Reservoirs--Washington (State)--Grand Coulee Dam; Rock formations--Washington (State)--Grand Coulee Dam
    • Excursion boat, "Miss Coulee," passing Whitestone Rock, a picturesque landmark about 27 miles above the Grand Coulee Dam.
    • Aircraft Lands on Grand Coulee Dam Reservoir

    • Spillways--Washington--Grand Coulee Dam; Reservoirs--Washington (State)--Grand Coulee Dam; Transport planes--Washington (State)--Grand Coulee Dam
    • The first aircraft to land on the storage reservoir above the Grand Coulee Dam. The plane, a Fairchild C-24, was piloted by Mr. Alfred Wolf, with Mrs. Wolf as passenger, and was being flown from factory to a customer.
    • Flame Cleaning Spillway Drum Gates

    • Spillways--Washington--Grand Coulee Dam; Construction employees--Washington (State)--Grand Coulee Dam; Welding--Washington (State)--Grand Coulee Dam
    • "Flame-cleaning" the exterior of a spillway drum gate, preparatory to the application of four coats of paint. Eighteen acres of metal surface stared welders in the face when they recently began cleaning the interiors and exteriors of the 11 giant...
    • Yacht Club in Lake Roosevelt

    • Boats--Reservoirs--Washington (State)--Grand Coulee Dam; Spillways--Washington--Grand Coulee Dam
    • Lake back of Grand Coulee Dam, with "Yacht Club" landing and government dock in central foreground. The 230-kilovolt left switchyards appear in the background on the hillside.
    • Moving Shasta Stator

    • Hydroelectric generators; Employees--Washington (State)--Grand Coulee Dam; Hoisting machinery; Flags--United States
    • Lifting the 245-ton Shasta stator and thrust bearing bracket from the erection base between Grand Coulee units L-2 and L-3, in the left powerhouse, to their seat above the turbine in pit No. 7.
    • Tight fit between Stator and Rotor

    • Hydroelectric generators; Employees--Washington (State)--Grand Coulee Dam; Hoisting machinery
    • A tight fit. The clearance between the huge 25-foot rotors and the stators of the two 75,000-kilowatt Shasta Dam generators, being installed at Grand Coulee Dam to make additional power available for war industries, is only 5/8 inch. In lowering...
    • Open Spillways and Falsework

    • Hoisting machinery; Spillways--Washington--Grand Coulee Dam; Road construction--Washington (State)--Grand Coulee Dam
    • Spillway section of the Grand Coulee Dam, with the erection of falsework for the spillway bridge arch barrels in progress.
    • Leveling Shoes

    • Employees--Washington (State)--Grand Coulee Dam; Hydroelectric generators
    • Eight "shoes" and one 8-foot iron and steel "doughnut" make up a thrust bearing for one of the big generating sets at the Grand Coulee powerhouse. Weeks of machine work and polishing are put into making the thrust runner, the face of which must be...
    • The Blue Ox

    • Tugboats--Washington (State)--Grand Coulee Dam; Bulldozers; Trucks--United States--Washington (State)--Grand Coulee Dam
    • The "Blue Ox," a small tug driven by a 125-horsepower Diesel motor, was trucked from the reservoir above the Grand Coulee Dam to the river below, to be used in sounding operations, part of a study to determine the necessity for widening the river...
    • Arrival of Transformer

    • Dams; Trestles; Dump trucks--Washington (State)--Grand Coulee Dam; Electrical apparatus
    • Private contractor the General Electric Company furnished transformers under the specifications order number 896. This photograph shows the first of many transformers being delivered to the Grand Coulee Dam.
    • Grand Coulee Waterfall

    • Spillways--Washington--Grand Coulee Dam; Floods--Columbia River
    • Spectacular waterfall at Coulee Dam surpasses Niagara in height. During the 1940 flood stage, the Columbia River was diverted through the outlet works and over a portion of the unfinished spillway section.
    • Sharpening Drill Bits: Finished Product

    • Forge shops--Washington (State)--Grand Coulee Dam
    • Re-sharpened drill bits ready for reuse in drilling core holes to facilitate grouting fissures, cracks, and voids in the foundational bedrock of Grand Coulee Dam. Construction crews used these drill bits for shaft and tunnel method exploration of...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK