Skip to main content

CONTENTdm Website

Add or remove other collections to your search:



Narrow your search by:



Author

Date Original

Digitization

TGM Subject

You've searched: Frank A. Banks Collection

  • TGM Subject: Dam
(591 results)



Display: 20

    • Switchgears

    • Electrical apparatus; Employees--Washington (State)--Grand Coulee Dam
    • 6900-volt switchgear XLS panels in the station service bay of the left powerhouse.
    • Flame Cleaning Spillway Drum Gates

    • Spillways--Washington--Grand Coulee Dam; Construction employees--Washington (State)--Grand Coulee Dam; Welding--Washington (State)--Grand Coulee Dam
    • "Flame-cleaning" the exterior of a spillway drum gate, preparatory to the application of four coats of paint. Eighteen acres of metal surface stared welders in the face when they recently began cleaning the interiors and exteriors of the 11 giant...
    • Giant Gantry Crane

    • Hoisting machinery; Roads--Washington (State)--Grand Coulee Dam; Automobiles--Washington (State)--Grand Coulee Dam
    • A 150-ton crane on the dam above the left powerhouse, used in assembling and installing coaster gates over the entrances to the penstocks.
    • Penstock X-Ray Machine

    • Penstocks--Washington (State)--Grand Coulee Dam; Equipment & personnel transportation; Spillways--Washington (State)--Grand Coulee Dam
    • A 200,000-volt X-ray machine photographing the circumferential welded seams of a main unit penstock section. One picture covers 16 inches of the seam; the penstock liner is rotated so that successive 16-inch sections of the seam are X-rayed. The...
    • American Flag

    • Power plants--dams--Washington (State)--Grand Coulee Dam; Flags--United States
    • A 20x38 American Flag was hung against the east wall of the west powerhouse to inspire workmen to maximum efficiency.
    • Rotor Installation

    • Hydroelectric generators; Hoisting machinery; Employees--Washington (State)--Grand Coulee Dam
    • A 527-ton rotor, for the first of the 108,000 kilowatt generating sets, being fitted inside the stator or stationary section of main unit L-3. Two 350-ton cranes, joined together by means of a 60-ton lifting beam consisting of two single-trees and...
    • Conveyor of New Mixing Plant

    • Conveying systems--Washington (State)--Grand Coulee Dam; Concrete mixers--Washington (State)--Grand Coulee Dam; Construction
    • A bucket conveyor will be used to lift aggregate from timber bunkers to the top of the new Bureau of Reclamation mixing plant, where a chute will direct the flow into any one of three compartments of a storage bin.
    • Penstock Hoisting

    • Penstocks--Washington (State)--Grand Coulee Dam; Equipment & personnel transportation; Spillways--Washington (State)--Grand Coulee Dam
    • A main unit penstock section about to be hoisted into a right power house turbine pit. A total of 126 sections was moved by this method into the right power house turbine pits without a single mishap.
    • Elevator in West Powerhouse in Operation

    • Elevators; Employees--Washington (State)--Grand Coulee Dam
    • A passenger leaving the 4,000-pound capacity elevator in the control bay of the west powerhouse. The machine can be operated either with or without an attendant, and travels about 180 feet. A 10,000-pound capacity freight elevator is in service in...
    • Reinforcing Steel

    • Safety equipment; Employees--Washington (State)--Grand Coulee Dam; Smoking--Washington (State)--Grand Coulee Dam
    • A photograph of workers preparing heavy reinforcing steel while two men loiter smoking.
    • Selling War Bonds

    • Cranes; Employees--Washington (State)--Grand Coulee Dam; War bonds & funds--United States
    • A photograph representing the importance of and push for workers to buy war bonds.
    • Diamond Drilling

    • Drilling & boring machinery; Construction employees--Washington (State)--Grand Coulee Dam
    • A photograph showing a government worker drilling uplift pressure holes into the bedrock with a air-driven Sullivan Turbinair diamond drill.
    • Drum Gate Inspection

    • Spillways--Washington--Grand Coulee Dam; Employees--Washington (State)--Grand Coulee Dam
    • A photograph showing engineers checking the installation of hinge anchors, due to the fact that some of the hinge anchors installed had interference between the anchor and the base where they were to be connected.
    • Spillway Bridge

    • Spillways--Washington--Grand Coulee Dam; Road construction--Washington (State)--Grand Coulee Dam; Construction employees--Washington (State)--Grand Coulee Dam
    • A photograph showing workers working on the falsework for the spillway bridge.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK