Skip to main content

CONTENTdm Website

Add or remove other collections to your search:



Narrow your search by:



Author

Date Original

Digitization

TGM Subject

You've searched: Frank A. Banks Collection

  • Digitization: long
(1286 results)



Display: 20

    • Seismograph Station Equipment

    • Seismographs--Washington (State)--Coulee Dam
    • Grand Coulee Seismograph Station. Time Control. From left to right: 1. The 115 kilocycle receiver attuned to NPG, San Francisco, with telechron timing clock for turning the received on and off, for the automatic reception of long wave radio time...
    • Conveyor Suspension Bridge

    • Conveying systems--Washington (State)--Grand Coulee Dam; Excavation; Brett Gravel Pit
    • Seen here is the central tower of the conveyor system construction and excavation workers used to remove spoil from the Grand Coulee Dam site.
    • North End of Block Forty

    • Conveying systems--Washington (State)--Grand Coulee Dam; Cofferdams
    • Shown here is the north end of block 40 in foreground, the timber crib plug to the cofferdam cell cluster, center tower of aggregate suspension bridge tower in cell 5, cofferdam section "G." Bridge spans on both sides of tower, 1437 feet....
    • Scroll Case Elbow

    • Water tunnels--Washington (State)--Grand Coulee Dam; Concrete
    • Special elbows were required to connect a Shasta turbine scroll case in one turbine pit with a penstock in an adjoining pit because the Shasta turbines turned in a "left-handed" direction while the Grand Coulee units turn "right-handed. Each inlet...
    • Control Room in Operation

    • Control rooms--Washington (State)--Grand Coulee Dam; Employees--Washington (State)--Grand Coulee Dam
    • From the control room desk at the left, power plant operators have telephone connections with all parts of the dam and powerhouse, and long distance outlets through the local Bell telephone system, also facilities for communicating with other power...
    • Assembly Building Nearing Completion

    • Construction; Hoisting machinery
    • To expedite the assembling of new turbine and generators and to store government equipment, the Bureau of Reclamation is constructing a large assembly building on the west shore, upstream from the dam. The structure ultimately will be 357 feet...
    • Falsework for Highway

    • Road construction--Washington (State)--Grand Coulee Dam
    • Falsework and forms for the construction of the arch-type highway spans over the eleven drum gates in the 1650-foot spillway. The bridges will be comprised of 7400 cubic yards of heavily reinforced concrete. The elevation of the water in the...
    • Control Cable Tunnel

    • Employees--Washington (State)--Grand Coulee Dam; Railroads; Tunnels--Washington (State)--Grand Coulee Dam
    • Control cable tunnel, two-thirds of a mile long and 12 feet in diameter, for carrying the electrical lines that will someday join the dam's two powerhouses into a common network. Conduits have been embedded in the concrete floor, and cable trays,...
    • East Bank Excavation

    • Public Works projects; Cranes; Excavation; Diversion weirs
    • Long view of excavation activities behind east side of central block 40 on the Columbia River taken from the unfinished point of the east side trestle bridge.
    • Gravel Stockpiles

    • Concrete; Dam construction; Dams; Construction; Excavation; Power plants
    • Long view photograph of conveyor system and storage deposit for raw materials used in the manufacture of concrete.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK