Skip to main content

CONTENTdm Website

Add or remove other collections to your search:



Narrow your search by:



You've searched: WSU Buildings Image Collection

  • Description: 11
(5 results)



Display: 20

    • Bohler Gym, construction May 25, 1927

    • Buildings -- Washington State University -- History; Gymnasiums -- Washington (State) -- Pullman; Building construction -- Washington (State) -- Pullman
    • A scene looking west of Bohler Gym, WSU building #11, during the early stages of construction. Steel reinforced wooden frames for the poured concrete foundation surround the structure. To the left of the image, a lifting tower is complete. In the...
    • Machine Shop, Mechanical Engineering, 1899

    • Buildings -- Washington State University -- History; Machine shops -- Washington (State) -- Pullman
    • An interior view of 11 men working and examining various machines inside Mechanical Engineering, WSU building 22. Belts attached to various wheels near the ceiling appear to power the tools. The embossed seal of Fay & Scott of Dexter, Maine is...
    • Bohler Gym, interior, 1936 Student Strike

    • Buildings -- Washington State University -- History; Strikes -- Washington (State) -- Pullman; Gymnasiums -- Washington (State) -- Pullman
    • A photograph of the interior of Bohler Gym, WSU building #11, packed with students during the 1936 student strike. Student strikers listen to their protest leader's report on Pres. Holland's response to their demands. Named for Fred Bohler, the...
    • Education Building, 1948

    • Buildings -- Washington State University -- History
    • A one-story, temporary building of frame construction. It has a partial basement and is heated by steam heat from the Central Heating Plant. There are 27 offices, 10 classrooms, 5 laboratories, and 2 projection rooms in the building. Overall...
    • Washington Square, 1948

    • Buildings -- Washington State University -- History; Dormitories -- Washington (State) -- Pullman
    • Twenty-nine of the units in Washington Square are prefabricated houses moved from Richland, Washington. These have plywood exterior and interior surfaces and cost the College an average of $1,735 per unit. Eleven other units are frame buildings,...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK