Northwest history. Bonneville dam. Locks & navigation. 1937-09-16
Rating |
|
Original index title |
Northwest history. Bonneville dam. Locks & navigation. 1937-09-16 |
Newspaper |
Oregonian ; 1937-09-16 |
Title |
The Dalles sees dike work start. |
Description |
The Dalles sees dike work start. - Preliminary clearing begins on $142,000 revetment. - Preliminary clearing of willows on the local waterfront was started this week by J. A. Terteling, Boise, Idaho, contractor, preparatory to start of work on the $142,050 revetment being erected here by the government to protect The Dalles from backwater of the Bonneville dam. |
Subject Keys |
Northwest history; Bonneville dam; Columbia river; ; J. A. Terteling, Boise, Idaho, contractor; The Dalles, Oregon; revetment; sewer system |
Date.Original |
1937 |
Resource Identifier |
nwh20-527 |
Subjects |
Bonneville Dam (Or. and Wash.) Shipping--Columbia River. Locks (Hydraulic engineering)--Columbia River |
Resource Type |
Text |
Genre |
Clippings |
Format.Use |
Image/JPEG |
Source |
Northwest history box 20 |
Language |
English |
Rights |
http://rightsstatements.org/vocab/CNE/1.0 |
Rights Notes |
Copyright not evaluated. Contact original newspaper publisher for copyright information. |
Add tags for Northwest history. Bonneville dam. Locks & navigation. 1937-09-16
you wish to report:
...